码迷,mamicode.com
首页 > 其他好文 > 详细

软件测试-chapte4-Graph Coverage

时间:2017-03-11 23:02:21      阅读:265      评论:0      收藏:0      [点我收藏+]

标签:charts   pre   scribe   final   sub   exe   cas   图的定义   esc   

1.Outline

  ?Introduction to Graph Coverage

  ? Graph Coverage Criteria

  ? Control Flow Graph Coverage

  ? Data Flow Graph Coverage

2.图在软件测试中应用广泛,并且图的来源有:

     – Control flow graphs (控制流图)

     – Design structure(设计结构)

     – FSMs and statecharts(有限状态自动机(FSM "finite state machine" )和 状态转换图)

     – Use cases (测试用例)

    测试意图通过某种方式覆盖整个图的所有方面

3.图的定义

  ? A set N of nodes, N is not empty
  ? A set N0 of initial nodes, N0 is not empty(注意起始节点不能为空,意思是图中必定出现只有后继没有前驱的节点)

                                                                 

                         如       技术分享  而不是  技术分享

 

  ? A set Nf of final nodes, Nf is not empty (终结点不为空)
  ? A set E of edges, each edge from one node to another – ( ni , nj ), i is predecessor, j is successor(i为前驱,j为后继)

4. 图的path

   path:A sequence of nodes – [n1, n2, …, nM] 

            并且每一对节点都是一条边

   Length : The number of edges – A single node is a path of length 0 (单节点也是有长度的为0)

   Subpath : A subsequence of nodes in p is a subpath of p 

   Reach (n) : Subgraph that can be reached from n (从n可以到达的子图)

    技术分享

5.  Test Paths and SESEs (测试路径和单入单出路径)

    Test Path : A path that starts at an initial node and ends at a final node (包含初始结点和终结点)

    Test paths represent execution of test cases       测试路径意味着测试用例的执行,但是一些测试用例可能不能覆盖到所有的测试路径

         – Some test paths can be executed by many tests

         – Some test paths cannot be executed by any tests

     SESE graphs : All  test paths start at a single node and end at another node (初始和终结点不同,因此至少两个节点)

           技术分享

6. Visiting and Touring

      Visit : A test path p visits node n if n is in p  (测试路径中的单个节点或边)

      Tour : A test path p tours subpath q if q is a subpath of p(测试路径中的子路径)

      技术分享

 

 7.  Tests and Test Paths

      ? path (t) : The test path executed by test t

      ? path (T) : The set of test paths executed by the set

     并且每一个测试(这里相当于一次具体的测试用例)只能去测试一条测试路径

    

      – Syntactic reach : A subpath exists in the graph  (语法到达,从测试路径图上看可以到达)

      – Semantic reach : A test exists that can execute that subpath(语义到达,设计的一组测试用例能够执行该条测试路径)

 

 

GRAPH COVERAGE CRITERIA (图的覆盖标准)

 

1.Testing and Covering Graphs (2.2)

  

    ? Test Requirements (TR) : Describe properties of test paths (描述了测试路径需要满足的条件)

    ? Test Criterion : Rules that define test requirements ()

    ? Satisfaction : Given a set TR of test requirements for a criterion C, a set of tests T satisfies C on a graph if and only if for every test requirement in TR, there is a test path in path(T) that meets the test requirement tr

     ? Structural Coverage Criteria : Defined on a graph just in terms of nodes and edges

     ? Data Flow Coverage Criteria : Requires a graph to be annotated with references to variables

 

    几种结构覆盖:

     Node Coverage (NC) :节点覆盖的TR中必须包含图G中每个可达的节点

     Edge Coverage (EC) : TR contains each reachable path of length up to 1, inclusive, in G.(注意:边覆盖TR必须包括每条可达的测试路径而且它的长度至少最多是1,这句话并不是说边覆盖就包含了节点覆盖,它们是不同的,因为当图只包含一个节点时,为了边覆盖的定义不得不作出节点长度为0这样折中的方案,意思是让所有的图都能具有这几种结构覆盖的定义,包括只有一个节点的图,类似的还有边对覆盖对于只有两个节点的图的情况)

     Edge-Pair Coverage (EPC) : TR contains each reachable path of length up to 2, inclusive, in G. (边对覆盖包含至少两条长度为2的测试路径)

     Complete Path Coverage (CPC) : TR contains all paths in G.  (完全路径覆盖,当然如果路径中有循环则所有情况是不可能完全列举出来)

     Specified Path Coverage (SPC):指定路径覆盖,即指定测试路径集合S

     示例:

           技术分享

 

          

 

 

 

   

软件测试-chapte4-Graph Coverage

标签:charts   pre   scribe   final   sub   exe   cas   图的定义   esc   

原文地址:http://www.cnblogs.com/--CYH--/p/6536291.html

(0)
(0)
   
举报
评论 一句话评论(0
登录后才能评论!
© 2014 mamicode.com 版权所有  联系我们:gaon5@hotmail.com
迷上了代码!