码迷,mamicode.com
首页 > 其他好文 > 详细

[POJ] POJ1008 Maya Calendar

时间:2017-08-26 13:40:20      阅读:146      评论:0      收藏:0      [点我收藏+]

标签:discover   names   stopped   should   closed   技术分享   return   amp   big   

该篇作为POJ之路的起点,初学乍道,请多指教。

Problem:  Maya Calendar

Description

During his last sabbatical, professor M. A. Ya made a surprising discovery about the old Maya calendar. From an old knotted message, professor discovered that the Maya civilization used a 365 day long year, called Haab, which had 19 months. Each of the first 18 months was 20 days long, and the names of the months were pop, no, zip, zotz, tzec, xul, yoxkin, mol, chen, yax, zac, ceh, mac, kankin, muan, pax, koyab, cumhu. Instead of having names, the days of the months were denoted by numbers starting from 0 to 19. The last month of Haab was called uayet and had 5 days denoted by numbers 0, 1, 2, 3, 4. The Maya believed that this month was unlucky, the court of justice was not in session, the trade stopped, people did not even sweep the floor. 

For religious purposes, the Maya used another calendar in which the year was called Tzolkin (holly year). The year was divided into thirteen periods, each 20 days long. Each day was denoted by a pair consisting of a number and the name of the day. They used 20 names: imix, ik, akbal, kan, chicchan, cimi, manik, lamat, muluk, ok, chuen, eb, ben, ix, mem, cib, caban, eznab, canac, ahau and 13 numbers; both in cycles. 

Notice that each day has an unambiguous description. For example, at the beginning of the year the days were described as follows: 

1 imix, 2 ik, 3 akbal, 4 kan, 5 chicchan, 6 cimi, 7 manik, 8 lamat, 9 muluk, 10 ok, 11 chuen, 12 eb, 13 ben, 1 ix, 2 mem, 3 cib, 4 caban, 5 eznab, 6 canac, 7 ahau, and again in the next period 8 imix, 9 ik, 10 akbal . . . 

Years (both Haab and Tzolkin) were denoted by numbers 0, 1, : : : , where the number 0 was the beginning of the world. Thus, the first day was: 

Haab: 0. pop 0 

Tzolkin: 1 imix 0 
Help professor M. A. Ya and write a program for him to convert the dates from the Haab calendar to the Tzolkin calendar. 

Input

The date in Haab is given in the following format: 
NumberOfTheDay. Month Year 

The first line of the input file contains the number of the input dates in the file. The next n lines contain n dates in the Haab calendar format, each in separate line. The year is smaller then 5000. 

Output

The date in Tzolkin should be in the following format: 
Number NameOfTheDay Year 

The first line of the output file contains the number of the output dates. In the next n lines, there are dates in the Tzolkin calendar format, in the order corresponding to the input dates. 

Sample Input

3
10. zac 0
0. pop 0
10. zac 1995

Sample Output

3
3 chuen 0
1 imix 0
9 cimi 2801



Analysis

施工中。。。。

Code
技术分享
 1 #include <iostream> 
 2 #include <stdio.h>  
 3 #include <string>
 4 #include <cstring>
 5 #include <time.h>
 6 
 7 using namespace std;
 8 
 9 int main()  
10 {
11     int year , day;
12     string month , res[500];
13     int amount = 0 , sum = 0;
14     
15     string Haab[] = {"pop", "no", "zip", "zotz", "tzec", "xul", "yoxkin", "mol", "chen", "yax", "zac", "ceh", 
16                      "mac", "kankin", "muan", "pax", "koyab", "cumhu", "uayet"};
17     string Tzolkin[] = {"imix", "ik", "akbal", "kan", "chicchan", "cimi", "manik", "lamat", "muluk", "ok", "chuen", 
18                         "eb", "ben", "ix", "mem", "cib", "caban", "eznab", "canac", "ahau"};
19     
20     cin >> amount;
21     cout << amount << endl;
22     for(int i=0 ; i<amount ; i++)
23     {
24         scanf("%d.",&day);
25         cin >> month >> year;
26         int j = 0;
27         for(j=0 ; j<19 ; j++)
28         {
29             if(month == Haab[j])    break;
30         }
31         sum = (365*year) + (j*20) + day;
32         
33         year = sum / 260;
34         month = Tzolkin[sum % 20];
35         day = sum % 13 + 1;
36         
37         cout << day << " " << month << " " << year << endl;
38         
39     }
40     
41     
42     return 0;  
43 }
View Code

 














[POJ] POJ1008 Maya Calendar

标签:discover   names   stopped   should   closed   技术分享   return   amp   big   

原文地址:http://www.cnblogs.com/unsigned-error/p/7435066.html

(0)
(0)
   
举报
评论 一句话评论(0
登录后才能评论!
© 2014 mamicode.com 版权所有  联系我们:gaon5@hotmail.com
迷上了代码!