码迷,mamicode.com
首页 > 其他好文 > 详细

CBO估计执行计划需要参考的三项

时间:2015-05-06 15:05:50      阅读:223      评论:0      收藏:0      [点我收藏+]

标签:

Estimator

The estimator determines the overall cost of a given execution plan. The estimator generates three different types of measures to achieve this goal:

  • Selectivity

    This measure represents a fraction of rows from a row set. The selectivity is tied to a query predicate, such as last_name=‘Smith‘, or a combination of predicates.

  • Cardinality

    This measure represents the number of rows in a row set.

  • Cost

    This measure represents units of work or resource used. The query optimizer uses disk I/O, CPU usage, and memory usage as units of work.

If statistics are available, then the estimator uses them to compute the measures. The statistics improve the degree of accuracy of the measures.


最重要的就是上面三个方面:

1.选择度

2.基数

3.成本

CBO估计执行计划需要参考的三项

标签:

原文地址:http://blog.csdn.net/lemontree1123/article/details/45535463

(0)
(0)
   
举报
评论 一句话评论(0
登录后才能评论!
© 2014 mamicode.com 版权所有  联系我们:gaon5@hotmail.com
迷上了代码!